Skip to content
FOR EXPERT TECHNICAL ADVICE - GIVE US A CALL MONDAY - FRIDAY 8.30AM - 4.30PM
We Are Currently Closed for the Easter Bank Holiday.
Any order placed during this time will be shipped after the bank holiday weekend.
FOR EXPERT TECHNICAL ADVICE - GIVE US A CALL 8.30AM - 4PM We Are Currently Closed for the Easter Bank Holiday. Any order placed during this time will be shipped after the bank holiday weekend.

Decatone SR60 Tennis Court Paint

£115.00 + VAT

  • Slip Resistant
  • Wide Range of Colours
  • Mould & Algae Resistant
  • Long Lasting
Size
Color: Spring Green

Key Features

Decatone SR60 Tennis Court Paint Number of Coats

Coats

2

Decatone SR60 Tennis Court Paint Drying Time

Drying Time

Dry: 1-2 hours.

Decatone SR60 Tennis Court Paint Location Details

Location

Exterior

Product Details

A tough, long lasting, slip resistant finish in deep, rich colours for macadam and concrete courts

  • Slip Resistant Value (SRV) 60 in wet or damp for safer play
  • Formulated with an algicide and fungicide
  • Wide range of colours, special colours to order
  • For airless spray application

A tough, long-lasting finish for macadam tennis courts. Slip resistance of 60 in the wet or damp for safer play, contains algicide and fungicide.

Application Details

Preparation

  • All surfaces should be free from loose and flaking material, dirt, grease and vegetative growth.
  • Any debris may be removed by vacuum or pressure blasting with air or water.
  • Brushing (manual or machine) may be suitable in particularly difficult areas, ie: under trees or areas constantly in the shade.
  • Decatone Tarmac Binder should be used to stabilise a friable, porous or aged concrete court or fretting macadam.

Application

  • Try and use only 1 batch number per colour used as colour variation can occur.
  • Stir well before use as stainers used can separate with time, best to mix thoroughly when using different batches.
  • Surfaces that are cold – below 5°C – are not suitable for coating.
  • Hot surfaces – above 30°C – should be cooled with water spray before application otherwise paint will dry before film formation is completed.
  • New bitumen should be left to harden off before coating. The time will vary with the nature of the surface and the weather. (Minimum 3-4 weeks in summer and up to 3 months in winter).
  • New concrete should be allowed to mature for several months before coating.
  • Do not over-paint/seal court.
  • Recommended application between March and October.
  • During the summer months there is a possibility of paint skinning from warm weather/transportation (top of inside lid and rim).
  • We recommend that the paint is pre-filtered on site through a course filter to remove skins before spraying.

For detailed application advice refer to the Product Datasheet

Datasheets

Technical Datasheets

Safety Datasheets

FOR EXPERT TECHNICAL ADVICE - GIVE US A CALL MONDAY - FRIDAY 8.30AM - 4.30PM
We Are Currently Closed for the Easter Bank Holiday.
Any order placed during this time will be shipped after the bank holiday weekend.
FOR EXPERT TECHNICAL ADVICE - GIVE US A CALL 8.30AM - 4PM We Are Currently Closed for the Easter Bank Holiday. Any order placed during this time will be shipped after the bank holiday weekend.
×

Call for Price

I agree to my email being stored and used to receive the newsletter.
.nav-bar__item a[href="/collections/special-offers"] { color: red; }